An AI prompt that turns your load facts into a short, factual detention request a broker or shipper can approve and pay.
Write a clear detention request to [broker/shipper] for load [load number]. Facts: arrived [time], loaded/unloaded [time], free time [hours], total detention [hours], rate [rate/hr]. Reference the rate confirmation terms and attach-list: [BOL, timestamps, driver notes]. Keep it factual, professional, and ask for payment confirmation by [date].
This prompt deals with money and contract terms. Check the amounts, free time and deadlines against your own rate confirmation before you send anything, and read the draft in full. The AI works from what you paste in, not from your agreement.
Subject: Detention request, Load 48213-A
Hi Ridgeline team,
We are requesting detention for load 48213-A, delivered Oct 14. Our driver checked in at 7:00 AM and was unloaded at 12:30 PM, 5.5 hours on site.
The rate confirmation allows 2 hours of free time, with detention at $50/hr after that. Detention owed: 3.5 hours × $50/hr = $175.00.
Attached: signed BOL with in and out times, ELD timestamps, and driver notes.
Please confirm payment by Oct 23, or tell us if you need anything else to process it.
Thanks,
[Your name] · [Company] · [Phone]
Vic reads the load, the rate confirmation and the timestamps, drafts the request, and holds it for your approval.
The load number, arrival and departure times, the free time in the rate confirmation, billable hours, the hourly rate, the total, a list of attached documents, and the date you want payment confirmed.
Usually total time on site minus the agreed free time, billed at the agreed hourly rate. Rounding and billing increments vary, so follow your rate confirmation.
A signed BOL showing in and out times, ELD or gate timestamps, driver notes, and the rate confirmation if the broker asks for it.
Any AI chat tool. Paste it, fill the fields, and review the draft before sending. In Vic, the facts fill in for you.
Recover unloading fees with receipt and load details.
Open prompt → Check termsClaim truck-ordered-not-used pay after a late cancel.
Open prompt → ReportVolume, margin and on-time by lane, with what changed and why.
Open prompt →